DC BLOX Expands Birmingham Information Middle for Excessive-Efficiency Computing


DC BLOX Expands Birmingham Data Center for High-Performance Computing
DC BLOX, a supplier of information facilities and fiber community options throughout the Southeastern United States, has introduced the completion of its enlargement venture on the Birmingham, Alabama information heart. The enlargement includes a new information corridor design to accommodate the rising demand for Excessive-Efficiency Compute (HPC) functions, DC BLOX mentioned on Thursday.

Additionally Learn: MC Digital Realty Opens 34 MW Information Middle in Inzai Metropolis, Japan

Information Corridor Growth

The expanded information corridor can home each high-density cupboards and commonplace cupboards inside the identical area, facilitating the deployment of GPU clusters alongside conventional retail racks.

With the power to assist as much as 2.4 MW of 3N/2 distributed redundant energy, the infrastructure aligns with Tier 3 design requirements and may accommodate as much as 240 commonplace retail cupboards and 36 HPC-capable cupboards, every supporting as much as 35 kW of energy, the corporate mentioned.

Growth for Rising Demand

The enlargement addresses the “surging demand for HPC functions pushed by a number of elements, together with the provision of cost-effective HPC techniques based mostly on commodity {hardware}, specialised processor accelerators equivalent to GPUs, and the escalating utilization of Synthetic Intelligence and Machine Studying (AI/ML) functions,” a DC BLOX assertion mentioned.

“This enlargement underscores DC BLOX’s steadfast dedication to empowering the technology-based economic system of Birmingham and past,” mentioned Jeff Uphues, CEO of DC BLOX. “Our modern mixed-hall design and HPC functionality are testaments to our dedication to reply to the precise wants of our prospects in Birmingham. And our new HPC-enabled information corridor might be added to the info facilities in any of our markets, as demand requires.”

Additionally Learn: Vantage Secures USD 64 Million Mortgage for Taipei Information Middle

Future-Prepared Infrastructure

DC BLOX’s Birmingham information heart, initially opened in July 2019, has expanded to incorporate 13,000 sq. toes of workplace area and 18,000 sq. toes of information heart area.

With plans for additional enlargement and the event of a number of hyperscale and build-to-suit information facilities, the corporate says the campus has the potential for as much as over 50 MW of extra future energy.

DC BLOX’s information facilities are positioned in Birmingham, Huntsville – Alabama; Chattanooga, Tennessee; Greenville, Myrtle Seashore – South Carolina, with others in growth close to Atlanta and Berkeley County, South Carolina.



Recent Articles

Related Stories

Leave A Reply

Please enter your comment!
Please enter your name here

Stay on op - Ge the daily news in your inbox